Process Improvement in Furniture Manufacturing: A Case Study
dc.contributor.author | Ersoz, F. | |
dc.contributor.author | Ersoz, T. | |
dc.contributor.author | Peker, H. | |
dc.date.accessioned | 2024-09-29T16:20:46Z | |
dc.date.available | 2024-09-29T16:20:46Z | |
dc.date.issued | 2018 | |
dc.department | Karabük Üniversitesi | en_US |
dc.description | 59th International Scientific Conference on Information Technology and Management Science of Riga Technical University, ITMS 2018 -- 10 October 2018 through 12 October 2018 -- Riga -- 143265 | en_US |
dc.description.abstract | Today, with the increasing competition, enterprises are working to increase the product quality in order to meet the demands of the customers and increase the market share. The Six Sigma philosophy that emerged in the 1970s is a study to reduce the costs of poor quality in the production and service process. In this study, Six Sigma philosophy was applied in order to reduce the cycle time of the diamond sofa product produced by a furniture enterprise. Firstly, the production line was examined in detail by SIPOC analysis method and the cycle times of the processes were collected by chronometry method. Then, statistical methods such as proj ect identification document, Pareto diagram, Fishbone diagram were used. The control of the change in cycle time in the production of diamond sofa was calculated by ARENA 9.0 simulation program. © 2018 IEEE. | en_US |
dc.identifier.doi | 10.1109/ITMS.2018.8552968 | |
dc.identifier.isbn | 978-172810098-2 | |
dc.identifier.scopus | 2-s2.0-85060055858 | en_US |
dc.identifier.scopusquality | N/A | en_US |
dc.identifier.uri | https://doi.org/10.1109/ITMS.2018.8552968 | |
dc.identifier.uri | https://hdl.handle.net/20.500.14619/9321 | |
dc.indekslendigikaynak | Scopus | en_US |
dc.language.iso | en | en_US |
dc.publisher | Institute of Electrical and Electronics Engineers Inc. | en_US |
dc.relation.ispartof | 59th International Scientific Conference on Information Technology and Management Science of Riga Technical University, ITMS 2018 - Proceedings | en_US |
dc.relation.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.subject | DMAIC | en_US |
dc.subject | Furniture | en_US |
dc.subject | Manufacturing | en_US |
dc.subject | Simulation | en_US |
dc.subject | Six Sigma | en_US |
dc.title | Process Improvement in Furniture Manufacturing: A Case Study | en_US |
dc.type | Conference Object | en_US |